The Plumbing Is In

The kitchen is basically done. The contractor came today and installed the disposal, the faucet, and hooked up the dishwasher. He also raised the dishwasher and stove to meet the countertop. Everything looks good and is in place.

I talked with my kitchen designer today. She spoke with the countertop manager and is having the backsplash replaced and side splashes installed to take care of the gap between the wall and the countertop. I think this is a better solution then having them rip it all out and start all over again. So besides the backsplash and side splashes, the kitchen is done. However, I won't be writing the final check until it's completely done.

Here are some photos of the kitchen. I think I've decided the red is too red and I might be changing the color sometime in the future. I think I might be leaning towards yellow but we'll see how I feel when I have some time to do the re-painting.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.